Salazar Homes › Projects

Project · Aberfeldie

Ensuite and main bathroom renovation, Aberfeldie

The owner wanted both bathrooms redone as part of a whole-home renovation, without moving out. We worked room by room so there was always a working bathroom in the house.

Walkthrough of the job (0:36)

  • Ensuite finished in about 3 weeks
  • 2 heated towel rails in the main bathroom
  • 1500 freestanding bathtub

The problem

This job was a whole-home renovation in Aberfeldie, just out of Essendon. It covered the main bathroom, the ensuite, the powder room, the laundry and the kitchen, with two balconies and the front porch also in the scope.

The owner was living in the house the whole time. They needed one bathroom working while the other was under construction. The ensuite had also been a cold room, and the owner wanted it to feel warm.

What we did

  • Room by room. We did one section at a time so the owner could stay in the property and keep using a bathroom.
  • Main bathroom. We put in a custom-made wall-hung vanity, an LED mirror, two heated towel rails, a two-in-one shower head and a 1500 freestanding bathtub.
  • Feature wall and niche. We tiled a KitKat-style feature wall. We also built a big custom niche and tiled it in the same KitKat tile so it matches the wall.
  • Ensuite. We installed heated flooring and a heated towel rail, with a KitKat-style feature wall and a tiled shower niche. It took about three weeks.
  • Finishes. Brass tapware and fittings, a double vanity with white countertop basins and two arched backlit mirrors, and grey stone-look tiles in the toilet area.

What made it hard

  • Working in stages. Doing one bathroom or section at a time takes longer than doing everything at once. That was the trade-off for letting the owner stay home.
  • An owner who was often at work. Eleazar was on site every stage. We kept the owner updated every day and every week on who would be here and what they'd be doing, so they could plan their own time.

“We'll just be in and out, and then we'll be just doing step by step, room by room.”Salazar Homes, on site

The build

On site · May 2026 (1:20)
On site · May 2026 (0:32)
On site · August 2026 (0:26)
Double vanity with two arched backlit mirrors against a green vertical tile wall Two arched mirrors and brass wall taps above white basins, plant between them Single basin on a timber vanity beside a white door, arched mirror above Shower with round brass rain head, hand shower and a green tiled niche Toilet beside a brass heated towel rail and toilet roll holder

See your bathroom before you commit to it

Get a free design of your actual bathroom. No obligation, no pressure: see it, change it, then decide.